ECO power in 2009 increased by 366.96 MW
According to NEC Ukrenergo as of 31/12/2009, the installed capacity of the ECO in Ukraine was 52 MW 957.74 (366.96 MW to more than as at 12/31/2008), in which:
TES generation companies - 27,257 MW (32 MW more)
AES - 13 835 MW (no change);
TPP and other thermal power plants - 6 368.26 MW (10.96 MW to more);
HPS - 4 MW 552.03 (no change);
PSPP - 861.5 MW (at 324 MW more)
WPP - 83.95 MW (no change).
In 2009, in particular:
increased the installed capacity of the condensing equipment TES Ltd Skhidenerho to 32.0 MW:
at Zuevskaya TES unit № 2 after pouzlovoy reconstruction, during which the works on modernization of the turbine with new technical solutions in its flow path, modernization of the boiler, electrostatic precipitator, integrated switchgear, electrical equipment, relabeled with 300 to 320 MW (from 1.7.2009 city);
on Kurakhovskaya TES unit number 5, after the reconstruction, modernization of the turbine low-pressure cylinder and control system, reconstruction of heating surfaces of boiler, upgrading of electrostatic precipitators, the reconstruction of thermal power scheme to enhance its maneuverability peremarkovan from 210 to 222 MW (from 12/31/2009 was);
increase the installed capacity of pumped storage "Ukrhydroenergo" at 324.0 MW at the expense of commissioning of the Dniester PSP with a capacity of 324.0 MW hydro unit back in generator mode (21/12/2009 city);
introduced new power plants in the group unit stations with capacity 10.96 MW:
Gas piston power plant at ITCP "Cherkassyteplokommunenergo a capacity of 1.46 MW (from 1.1.2009, the);
cogeneration power plant, "Energy-1 LLC" TD "Ukrainian powder materials with the capacity of 3.5 megawatts (from 1.1.2009, the);
turbo type R-6-3.4 / 1 CHP JSC Zaporizhkoks a capacity of 6.0 megawatts (from 1.1.2009). (Source: UA Energy)